Change to English language   
 
 Ready in 5 minutes

 
After the arrival to the workplace by Multi Screen, it need only take 5 minutes for the machine to be ready for operation. Just do the following: Let the air out of the air springs. Lower the support legs. Start the engine, unfold the conveyor and now the machine is ready for operation.

Let the air out of the air springs.
Lower the support legs.
Lower the support legs.
Start the engine.
Unfold the conveyor.
The machine is ready for operation.
  
ZEMMLER Recycling- & Aufbereitungstechnik, Woschkower Weg 25, 01983 Großräschen, Tel. 0049 (0) 35753-26566, info@zemmler.de